Projects
Case Studies
Healthcare
University Hospital Waterford - OPD Clinic
- 32 steel frame modules
- 1000m2 modular building
- The bespoke project was designed in-house, manufactured offsite and installed over 2 days with minimum disruption
Education
Dean Maguirc College
- 32 steel frame modules
- 800m2 offsite teaching space accommodation
- The modular building was manufactured offsite and installed before students returned to school
Education
Colaiste Feirste School
- 16 CTX Plusline modules
- 120m2 offsite teaching space accommodation
- The additional accommodation space was manufactured and installed within 4 weeks from order
Commercial
Belfast Transport Hub
- 1600m² modular building
- 46no steel modular frames
- The bespoke project was designed in-house, manufactured offsite and installed over 3 working days, meeting specification within a 10-week period onsite
The Department of Education and Skills
Bailieborough Community School
- 330m2 modular building
- 10no steel modular frames
- Bespoke project designed in-house and manufactured offsite, meeting specifications within a 12-week period
Western Health and Social care trust
Altnagelvin Hospital
A recent project for the WHSCT was to provide a modular extension to the Emergency Department in Altnagelvin Hospital.
- 400m2 extension designed in-house
- Comprised of 12no steel framed modules
- Manufactured and installed within 8 weeks from order
Healthcare
Randox Health
- 72m2 laboratory space
- 5no CTX modules
- Completed within a 4-week period
Education Authority Northern Ireland
Hill Croft School
- 300m2 modular extension
- 12no steel modular frames
- Designed in-house and manufactured offsite to meet strict specifications within a 12-week period
Education Authority Northern Ireland
St patrick's college
Our design team worked with the EANI to plan and install a new bespoke facility for St Patricks College, Banbridge.
- 210m2 modular sports complex
- 8no steel framed modules
- Manufactured, installed and completed within a 10-week window
Commercial
Natural World Products
Installation of a two storey office block for NWP. Designed using a mixture of both external rendered finish and cedar cladding. Comprised of a boardroom, offices, kitchen, WC and store room.
- 100m2 steel frame modular office
- 3no modular sections
- Completed 10 weeks from order
Northern Ireland transport
Translink Rail
A new two-storey Jackleg accommodation manufactured and installed for Translink Rail, Belfast.
- 144m2 Jackleg cabins
- 4no 12x3m bespoke Jackleg cabins
- Complete within 4 weeks of order
Commercial
Seagate Technologies
Manufacture and installation of new CTX buildings and shipping containers at Seagate Technologies, comprising of two storied accommodation for use as storage containers, offices, canteen and Covid screening unit including staircase and gantry walkway.
- 950m2 CTX Modules and Shipping Containers
- 48no modular units
- Manufactured, installed and completed within a 10-week window
Department of Education and Skills Ireland
St. Catherine’s School
The job required 6 modules to replace the existing classrooms. Our design team created like for like replacements that fit our customer’s budget.
- 400m2 extension designed in-house
- Comprised of 6no steel framed modules
- Manufactured and installed within 8 weeks from order
Northern Ireland Transport
Translink
Installation of the new Translink Driver Training Centre. The steel framed modular building was designed and manufactured in house with a turn key finish. Comprised of classrooms, offices, toilets, stores and canteens.
- 250m2 steel frame modular building
- 7no steel framed modules
- Delivered and installed 6 weeks from order
Belfast City Council
Springfield Dam
Design, manufacture and installation of a community classroom for the Springfield Dam Regeneration Scheme, Belfast. Will be used to teach the public about the history of the area.
- 48m2 community classroom
- 12x4m bespoke cabin
- Manufactured and installed within a 3 week period
Health Service Executive
Cavan General Hospital
Installation on the roof deck of Cavan General Hospital. The CTX modules were installed during the night to avoid disruption to the hospital peak times.
- 150m2 laboratory space
- 10no CTX modules
- Complete within 4 weeks of order
Council
Donegal Council
Design, manufacture and installation of anti-vandal accommodation at Donegal Council Depot, Ballyshannon. Used for office space, canteen, drying room and toilet facilities.
- 125m2 depot
- 3no anti-vandal modules
- Complete within 5 weeks from order
Western Health And Social Care Trust
Altnagelvin Hospital
Manufacture and installation of modules at Altnagelvin Hospital. These were craned over the hospital into an internal courtyard and linked onto the main hospital building. Providing changing rooms, showers, locker rooms and toilets.
- 125m2 extension
- 5no bespoke CTX modules
- Complete within 4 weeks of order
Commercial
Shane's Castle Antrim
Design and manufacture of glamping pods for Blairs caravans, delivered to Shanes Castle Antrim. Designed to sleep up to four people with a turn key finish.
- Total of 210m2
- 10no glamping pods
- Completed 8 weeks from order
Department of Education and Skills Ireland
Columba College
Rented to the LWETB, this refurbished modular building was installed at Columba College Killucan. This also included the new fencing, extra car park spaces and path to classrooms.
- 288m2 classroom incl a SEN room
- 8no refurbished modules
- Complete with 4 weeks of order